Synth tech news
Update
I received 2ea MOTM-730 VC Divider Rev B (added 3 pullups) CPU boards. The pre-production sheet metal panels are due to arrive Tuesday PM (5pcs, cost the same as 2pcs so.....). Hopefully I will have some pictures Wed PM of the 'real' module and I'll get out my new USB-based logic analyzer and grab some screenshots. I have already soldered most of the parts on to the 2 boards. I can do the 1206 parts with ease, the 0603 parts are really a pain :(
Also shipped (by ground) are 300pcs of various front panels. This should keep me in panels for the next 6 months or so.
I am off the next 7 days from my 'real job' so I will be able to do a LOT of catching up. Here is what I plan to do:
a) ship *every* MOTM 2.0 outstanding order
b) finish making the '420, '190 and '800 kits
c) complete 12 assembled modules (I just finished making 8 MOTM-910s today)
d) build 20 Frac modules
e) get the CGX pc boards to prototype fab (actually, there are 4 different boards in the set)
I will be available to chat at 817 281 7776 if you want to call and check up on your order (no I don't mind).
I will be MOTM vacation July 7-11, no shipments, no work except I will check email.
Paul S.
Great stuff, I should be back home on the 4th, hopefully have some kits waiting for me to be assembled :-)
I received 2ea MOTM-730 VC Divider Rev B (added 3 pullups) CPU boards. The pre-production sheet metal panels are due to arrive Tuesday PM (5pcs, cost the same as 2pcs so.....). Hopefully I will have some pictures Wed PM of the 'real' module and I'll get out my new USB-based logic analyzer and grab some screenshots. I have already soldered most of the parts on to the 2 boards. I can do the 1206 parts with ease, the 0603 parts are really a pain :(
Also shipped (by ground) are 300pcs of various front panels. This should keep me in panels for the next 6 months or so.
I am off the next 7 days from my 'real job' so I will be able to do a LOT of catching up. Here is what I plan to do:
a) ship *every* MOTM 2.0 outstanding order
b) finish making the '420, '190 and '800 kits
c) complete 12 assembled modules (I just finished making 8 MOTM-910s today)
d) build 20 Frac modules
e) get the CGX pc boards to prototype fab (actually, there are 4 different boards in the set)
I will be available to chat at 817 281 7776 if you want to call and check up on your order (no I don't mind).
I will be MOTM vacation July 7-11, no shipments, no work except I will check email.
Paul S.
Great stuff, I should be back home on the 4th, hopefully have some kits waiting for me to be assembled :-)
0 Comments:
Post a Comment
<< Home